CITY OF SAN ANTONIO
TRANSPORTATION & CAPITAL IMPROVEMENTS
Interdepartmental Correspondence
 
TO:                                          Erik Walsh, City Manager
 
FROM:                     Razi Hosseini, P.E., R.P.L.S., Interim Director, Transportation & Capital Improvements 
 
COPIES:                     Ben Gorzell, Chief Financial Officer; Kevin Barthold, City Auditor; Rod Sanchez, Assistant City Manager; Carlos Contreras, Assistant City Manager
 
SUBJECT:                     Consideration of High Profile Solicitation for Release
 
DATE:                     October 15, 2019
 
The following high profile solicitation is scheduled to be released within the next month.
 
Terminal A Electrical System Expansion (TCI on behalf of Aviation) - The City of San Antonio is soliciting for electrical upgrades to be performed at Terminal A to allow for future expansion within the Terminal at the San Antonio International Airport.  This project will allow for Terminal A to receive electrical system upgrades necessary to ensure adequate electrical power to the number of users in Terminal A.  These upgrades will be comprised of a new grounding electrode conductor (GEC) system for safety upgrades and a reconfiguration of the vendor service entrance which will include the replacement of the existing switchboards, a new central uninterrupted power supply (UPS) system, coordination with CPS to replace the existing utility transformers, and finally an arc flash study to test the electrical system for safety reasons.
 
Department:                                                                   TCI on behalf of Aviation
Solicitation Type:                                              Request for Competitive Sealed Proposal
Contract Value:                                              $2.8 million
Term of Contract:                                             Until Project Completion (estimated September 2020)
Release Date:                                                                   October 18, 2019
Closing Date:                                                                  December 4, 2019
Proposed Council Date:                       February 2020
Contact Information:                     Razi Hosseini, Interim Director, TCI; Russell J. Handy, Director, Aviation
Evaluation Criteria:                     Experience, background and qualifications:  30 points
Understanding of the project and proposed management plan: 25 points
                     Experience with San Antonio region issues and past experience with the City of San Antonio: 10 points
                     Price Proposal:  15 points
                                                                              SBE Prime Contract Program: 10 points
                                                          M/WBE Prime Contract Program: 10 points
SBEDA Requirements:                          26% M/WBE Subcontracting Requirement
                                                                                           1% AABE Subcontracting Requirement
Local Preference Program:                     Not Applicable
Veteran Owned Small Business Preference Program: Not Applicable
 
Voting Members:                       Carlos Contreras, Assistant City Manager, City Manager’s Office
                                                               Thomas Bartlett, Aviation Deputy Director, Aviation
                                                               Gopinath Akalkotkar, AIA, LEED AP, City Architect, TCI
                                                               Robert Garcia, Interim Capital Program Manager, TCI
                                                               Chris Reininger, Facilities Electrical Superintendent, Aviation
                                                               Crystal Gonzales, P.E. CBO, Department Engineer, DSD
                                                               Robert Payne, Manager Customer Engineering, CPS Energy