File #: 18-1610   
Type: Miscellaneous Item
In control: City Council A Session
On agenda: 5/10/2018
Posting Language: Ordinance approving Advanced Funding Agreements with the Texas Department of Transportation to rebuild seven traffic signals as part of the Highway Safety Improvements Program in the total amount of $198,679.00 payable to TxDOT and accepting $1,634,900.00 in HSIP infrastructure. [Peter Zanoni, Deputy City Manager; Mike Frisbie, Director, Transportation & Capital Improvements]
Attachments: 1. Advance Funding Agreement_Vance Jackson at La Manda Blvd, 2. Project Map_Vance Jackson at La Manda Blvd, 3. Advance Funding Agreement_New Braunfels Ave at Steves Ave, 4. Project Map_New Braunfels Ave at Steves Ave, 5. Advance Funding Agreement_Pleasanton Road at Formosa Blvd, 6. Project Map_Pleasanton Road at Formosa Blvd, 7. Advance Funding Agreement_Marbach Road at Horal Drive, 8. Project Map_Marbach Road at Horal Drive, 9. Advanced Funding Agreement_Brownleaf Dr. at Military Dr. W., 10. Project Map_Brownleaf Dr. at Military Dr. W, 11. Advance Funding Agreement_Callaghan Road at Ingram Road, 12. Project Map_Callaghan Road at Ingram Road, 13. Advance Funding Agreement_Wurzbach Road at Bluemel Road, 14. Project Map_Wurzbach Road at Bluemel Road, 15. Draft Ordinance, 16. Ordinance 2018-05-10-0343, 17. Staff Presentation

DEPARTMENT: Transportation & Capital Improvements  

 

 

DEPARTMENT HEAD: Mike Frisbie, P.E.

                                                                                                        

                                                           

COUNCIL DISTRICTS IMPACTED: Council District 1, 3, 4, 6, 7, and 8

 

 

SUBJECT:

 

Advance Funding Agreements for Traffic Signal Upgrades

 

 

SUMMARY:

 

Consideration of an item related to the rebuilding of seven traffic signals as part of the Texas Department of Transportation’s (TxDOT) Highway Safety Improvements Program (HSIP) and authorizing the execution of seven Advance Funding Agreements between the City of San Antonio and TxDOT in the total amount of $198,679.00 payable to TxDOT and accepting $1,634,900.00 in HSIP infrastructure in the rebuilding of traffic signals at the following locations:

Vance Jackson Road and La Manda Boulevard

Council District 1

New Braunfels Avenue and Steves Avenue

Council District 3

Pleasanton Road and Formosa Boulevard

Council District 3

Marbach Road and Horal Drive

Council Districts 4 & 6

Brownleaf Drive at Military Drive West

Council District 6

Callaghan Road and Ingram Road

Council Districts 6 & 7

Wurzbach Road at Bluemel Road

Council District 8

 

 

BACKGROUND INFORMATION:

 

The Highway Safety Improvements Program (HSIP) aims to eliminate or reduce the number and severity of traffic crashes. The program is limited to specific project and crash types identified in the Texas Strategic Highway Safety Plan (SHSP). The HSIP included funds for construction and operational improvements of qualifying projects that were located off the state highway system.  Federal dollars are used to fund the program and the local government is required to provide a 10% match for construction funding, in addition to design and environmental costs.  TxDOT will bid and construct the projects.

 

Based on Transportation & Capital Improvement traffic studies and staff recommendations, seven intersections were selected to be rebuilt to the latest traffic signal standards during TxDOT’s 2015, 2016, and 2017 HSIP call for projects and scheduled for construction later this year.  All seven roadway intersections listed below are currently signalized with all equipment being mounted on wood poles and span wires.  The rebuilding includes replacing the wood poles with steel mast arms, upgrading the vehicle detection system, and adding audible pedestrian signals, battery backup systems, traffic monitoring cameras, and illuminated street name signs.

 

Vance Jackson Road and La Manda Boulevard

Council District 1 (2016 HSIP)

New Braunfels Avenue and Steves Avenue

Council District 3 (2015 HSIP)

Pleasanton Road and Formosa Boulevard

Council District 3 (2016 HSIP)

Marbach Road and Horal Drive

Council Districts 4 & 6 (2015 HSIP)

Brownleaf Drive at Military Drive West

Council District 6 (2017 HSIP

Callaghan Road and Ingram Road

Council Districts 6 & 7 (2015 HSIP)

Wurzbach Road at Bluemel Road

Council District 8 (2015 HSIP)

 

 

 

ISSUE:

 

This ordinance authorizes the execution of seven Advance Funding Agreements between the City of San Antonio and TxDOT in the total amount of $198,679.00 payable to TxDOT and accepting $1,634,900.00 in HSIP infrastructure in the rebuilding of traffic signals at the following locations:

 

Vance Jackson Road and La Manda Boulevard

Council District 1

New Braunfels Avenue and Steves Avenue

Council District 3

Pleasanton Road and Formosa Boulevard

Council District 3

Marbach Road and Horal Drive

Council Districts 4 & 6

Brownleaf Drive at Military Drive West

Council District 6

Callaghan Road and Ingram Road

Council Districts 6 & 7

Wurzbach Road at Bluemel Road

Council District 8

 

 

 

These projects have been selected for funding under TxDOT’s 2015, 2016,  and 2017 HSIP, which provide federal funds to cover 90% of the construction costs and the local government is required to provide a 10% match for construction funding, in addition to design and environmental costsTxDOT will bid and construct the projects.

 

Of the $198,679.00 payment, $8,902.00 is included for preliminary TxDOT direct costs as required by the advance funding agreements. The remaining funds of $189,777.00 will cover the City’s required match for the federal funds and TxDOT construction related direct costs. Once reconstruction is completed, the City will continue to own, operate and maintain these traffic signals.

 

 

ALTERNATIVES:

 

As an alternative the City can elect not to authorize this Advance Funding Agreement and accept these funds.  However, the City would then be responsible to fund 100% of the construction costs to rebuild these traffic signals in a future project.

 

 

FISCAL IMPACT:

 

This is a one-time capital expenditure totaling $198,679.00 with funding available within the FY 2018 Traffic Signal Installation Project, a FY 2018 General Fund project. Of the $198,679.00 payment, $8,902.00 is included for preliminary TxDOT direct costs with the remaining funds of $189,777.00 to cover the City’s required match for the federal funds and TxDOT construction related direct costs.

 

 

RECOMMENDATION:

 

Staff recommends approval of this ordinance authorizing seven advance funding agreements between City of San Antonio and TxDOT to rebuild the traffic signals at Vance Jackson Road and La Manda Boulevard, New Braunfels Avenue and Steves Avenue, Pleasanton Road and Formosa Boulevard, Marbach Road and Horal Drive, Brownleaf Drive at Military Drive West, Callaghan Road and Ingram Road, and Wurzbach Road at Bluemel Road.