File #: 18-5008   
Type: Grant Applications and Awards
In control: City Council A Session
On agenda: 9/20/2018
Posting Language: Ordinance approving an increase to the project costs for the Air Traffic Control Tower at Stinson Municipal Airport for additional engineering and construction work and appropriating $104,751.42 from the Stinson Revolving Fund. [Carlos Contreras, Assistant City Manager; Russell Handy, Director, Aviation]
Indexes: Aviation Stinson, Stinson
Attachments: 1. Agreement, 2. TXDOT Document, 3. Draft Ordinance, 4. Ordinance 2018-09-20-0740
DEPARTMENT: Aviation


DEPARTMENT HEAD: Russell J. Handy


COUNCIL DISTRICTS IMPACTED: Citywide


SUBJECT:

Air Traffic Control Tower for Stinson Airport


SUMMARY:

This Ordinance authorizes an increase to the total project costs in the amount of $104,751.42 to the Air Traffic Control Tower at Stinson Municipal Airport (Stinson). The action will increase the total funding for the project to $5,893,254.00 with a total contribution of $2,063,516.20 from Texas Department of Transportation (TXDOT) and total City match of $3,829,737.80.

This action will appropriate $104,751.42 from the Stinson Revolving Fund and amend the FY 2018 Aviation Capital Budget.


BACKGROUND INFORMATION:

The Aviation Department has coordinated with the TXDOT in the development of a new air traffic control tower at Stinson Municipal Airport. This project planned, designed and constructed a new tower to eliminate anticipated line-of-sight issues that will occur with future development. As a grant requirement, TXDOT was authorized as the administrator for the project and selected the consultants and contractors and administers the funds and contracts as necessary. TXDOT contributed 90% of the total eligible project costs up to a total project contribution of $2,000,000.00 with the city responsible for the remaining project costs. When the construction contract was awarded, TXDOT agreed to increase their funding amount over the $2 million to $2,063,516.20.

The City Council authorization also authorized the submittal and acceptance of a grant for the design of the Tower with a subsequent amendment. In October 2014, City Council authorized a grant for the construction phase of the project through Ordinance 2014-10-16-0794.

Proposed Increase to Project
TXDOT has requested an increase in the project costs in the amount of $104,751.42 for several required changes to the project. First, as a part of the tree mitigation plan, a low-impact development system will be installed, including filtr...