File #: 19-2946   
Type: Capital Improvements
In control: City Council A Session
On agenda: 5/2/2019
Posting Language: Ordinance amending the on-call professional services agreements to increase the original contract capacity of $2,000,000.00 by an additional $750,000.00 for a total of $2,750,000.00 with Bain Medina Bain, Inc. and to increase the original contract capacity of $1,100,000.00 by an additional $500,000.00 for a total of $1,600,000.00 with Terra Design Group, Inc. for architectural and engineering design services for the Howard W. Peak Greenway Trails System. Funding for this ordinance is available from the 2015 Sales Tax Venue Fund included in the FY 2019 - FY 2024 Capital Improvement Program. [Colleen M. Bridger, MPH, PhD, Interim Assistant City Manager; Xavier D. Urrutia, Director, Parks & Recreation]
Attachments: 1. Amendment No. 1 - On-Call Professional Services Agreement with Terra Design Group, Inc. 5-2-2019, 2. Contracts Disclosure Form - Walter Heard with Terra Design Group, Inc., HWPGTS Trails System Program 4-4-2019, 3. Amendment No. 1 - On-Call Professional Services Agreement with Bain Medina Bain for Design HWP Greenway 5-2-2019, 4. Contracts Disclosure Form - Carl Bain with Bain Medina Bain, Inc. 4-4-2019, 5. PowerPoint for Design Contracts of the HWP Greenway Trails System 5-2-19, 6. Draft Ordinance, 7. Ordinance 2019-05-02-0351
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.
DEPARTMENT: Parks and Recreation


DEPARTMENT HEAD: Xavier D. Urrutia


COUNCIL DISTRICTS IMPACTED: City Wide


SUBJECT:

Amendments to Two On-Call Professional Services Agreements for Design of the Howard W. Peak Greenway Trails System


SUMMARY:

This ordinance authorizes amendments to two (2) on-call professional services agreements, to increase the original contract capacity of $2,000,000.00 by an additional $750,000.00 for a total of $2,750,000.00 with Bain Medina Bain, Inc. and to increase the original contract capacity of $1,100,000.00 by an additional $500,000.00 for a total of $1,600,000.00 with Terra Design Group, Inc. for architectural and engineering design services for the Howard W. Peak Greenway Trails System.


BACKGROUND INFORMATION:

The Howard W. Peak Greenway Trail System has been funded through a portion of a 1/8-cent voter-approved sales tax since its inception in 2000. The objectives of the program are to acquire and preserve open space along San Antonio creekways and to develop multi-use hike and bike trails, trailheads, signage and associated amenities for use by San Antonio residents and visitors.

A Request for Qualifications (RFQ) process for architectural and engineering design services was conducted in late 2016 and early 2017, to which nine (9) firms submitted proposals. The proposals were evaluated and ranked by a selection committee, who recommended selection of Bain Medina Bain, Inc. and Terra Design Group, Inc. to be awarded on-call professional services agreements for design, permit preparation, bidding assistance, and construction administration.

On March 2, 2017, City Council approved professional services agreements with Bain Medina Bain, Inc. in an amount up to $2,000,000.00 and with Terra Design Group in an amount up to $1,100,000.00 through Ordinance 2017-03-02-0130. Both agreements were executed for a period of three years with optional 2-year extensions. Under these agreements, Bain Medina Bain, Inc. and Terra De...

Click here for full text