File #: 20-1734   
Type: Capital Improvements
In control: City Council A Session
On agenda: 3/5/2020
Posting Language: Ordinance approving a task order to a Job Order Contract with Con-Cor Inc. for the installation of a HVAC system in an electrical room that houses airfield runway lighting control equipment for the San Antonio International Airport. This work is needed to reduce exposure of the equipment to humidity and heat. The task order, in an amount not to exceed $150,854.57, is funded from the FY 2020 Airport Operating and Maintenance Fund Budget. [Carlos Contreras, Assistant City Manager; Jesus Saenz, Director, Aviation]
Indexes: Aviation JOC, Aviation Other
Attachments: 1. Agreement, 2. Draft Ordinance, 3. Staff Presentation, 4. Ordinance 2020-03-05-0156
DEPARTMENT: Aviation


DEPARTMENT HEAD: Jesus H. Saenz, Jr.


COUNCIL DISTRICTS IMPACTED: Citywide


SUBJECT:

Task Order with Con-Cor Inc. for the Installation of a temperature control HVAC System in an Electrical Room housing airfield runway lighting control equipment at the San Antonio International Airport


SUMMARY:

This ordinance accepts a task order with Con-Cor Inc. (Con-Cor) for the installation of a HVAC system in an electrical room housing airfield runway lighting control equipment in order to provide temperature control and to minimize dust and humidity exposure to the equipment at the San Antonio International Airport campus in an amount not to exceed $150,854.57. Funding is available from the FY 2020 Airport Operating and Maintenance Fund Budget.


BACKGROUND INFORMATION:

The electrical room is located at 10251 Wetmore Road on airport property and houses airfield runway lighting control equipment. The room is not air conditioned or insulated from dust and heat. Aviation Department staff recommends installation of an air conditioning system to maintain the temperature and humidity levels within the room to protect the equipment from the effects of heat. The work includes the purchase and installation of duct work, an air conditioning pad and associated electrical infrastructure.

The San Antonio Airport System is utilizing Con-Cor, a job order contractor, for this work. Con-Cor is one of the approved JOC contractors through Ordinance 2018-10-11-0809 that provide the alternative project delivery method for construction, renovation, rehabilitation and maintenance projects for the San Antonio Airport System.


ISSUE:

This ordinance will authorize a proposal by Con-Cor for the following scope of work:

* Purchase and installation of 4 self-contained single package air conditioning units
* Purchase and installation of metal ductwork
* Purchase and installation of new electrical to units
* Weatherproofing of all duct penetrations
* Purchase and in...